TWDB locates Abilene Dam on Elm Creek about six miles northwest of Tuscola in Taylor County. The City of Abilene owns this historically municipal emergency-water-supply and recreational reservoir, while TPWD operates visitor access through its adjacent state park.
A state water permit on September 7, 1918 authorized construction; work began in 1919. TWDB's detailed dam plate gives completion in May 1921 and deliberate impoundment beginning August 1, 1921, while its overview summarizes completion in 1921. This chronology is different from the much younger Kirby Lake on Cedar Creek.
After its 1921 construction, Lake Abilene Dam underwent substantial repairs in 1941 and 1957. TWDB's historical survey records a 5,040-foot earthfill embankment, a maximum height of about 64 feet and a historic conservation-pool reference elevation of 2,012.3 feet above mean sea level.
TPWD lists 595 surface acres at the old reference pool. TWDB's storage figures are tied to the conservation-stage curve, not a claim that 595 acres of water are present today. Drought can strand launch ramps, restrict fish survival and change every aspect of a visitor trip.
The 2011 Wikimedia Commons photograph of the actual Lake Abilene shoreline predates the present drought closure. Its creator released it as CC BY-SA 2.0. It is documentary evidence of the named lake's setting, not a live water-level, fishing-permission or boat-ramp-status image.